Sending to SolidCAM in progress...

Downloaded file will be available after import in the SolidCAM tool library.

52mm Series
52mm Series
52mm Series
52mm Series
Select the files you wish to request
Downloads
Request {{cadTool}} format
{{cadTool}} format is not available

52mm (2.06") Shank • Heavy

52mm Series

メートル
インチ
SAP Material Number 2288279
ISO Catalog Number U200 TSHF 3.2 .75
ANSI Catalog Number U200 TSHF 3.2 .75
Grade K3560
[D] Shank/Bore Diameter 52.32 mm
[D] Shank/Bore Diameter 2.06 in
[TD] Tip Diameter 18.755 mm
[TD] Tip Diameter .738 in
Point Included Angle [SIGMA] 75
[L1] Gage Length 84.9 mm
[L1] Gage Length 3.34 in
[D2] Body Diameter Workpiece Side 69.8 mm
[D2] Body Diameter Workpiece Side 2.75 in
[LS] Shank Length 131 mm
[LS] Shank Length 5.16 in
[OAL] Overall Length 215.9 mm
[OAL] Overall Length 8.5 in
[LRO] Retainer Offset Length 120.65 mm
[LRO] Retainer Offset Length 4.75 in
すべての改良品を表示

使用法と用途

  • Cutting Conditions: SevereCutting Conditions: Severe
  • Insert Type: PlugInsert Type: Plug

特徴と利点

  • Catalog numbers containing "HF" indicate Hard Faced Treatment.

機械側

荷重...

ワーク側

荷重...
マイソリューションページにを追加しようとしています. 続行しますか?
product-image
Please adjust the following properties from

ISO製品型番

ANSI製品型番

to find similar products.

The following files are available

Please select a file to download

Models

Product data

ダッシュボード情報を表示するには、ログインする必要があります
Session expired due to inactivity, please login again
カートに追加しようとした製品()はありません カスタマーサービスにお問い合わせください。
アイテムがカートに正常に追加されました
カートを表示

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number ISO製品型番 材種    
Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

You are about to leave the Solution building process.

Are you sure you want to leave?