Editando solução
Adicionando solução
Nome da solução: {{SolutionName}}Desempenho melhorado
Use Case
- Máquina: Wirtgen W210i (2180h)
- Engine Power: 283 + 231 kW
- Line Spacing: 25mm (Eco Cutter Drum)
- Width of drum: 2000mm
- Suportes: HT22 (almost new, good condition)
- Holders on drum: 100
- Belt condition: Bom
- Track pad condition: Médio
Total Cutting Performance
- Total m²: 19.283 m²
- Total m³: 1.353 m³
- Total tons: 3.247 tons (density: 2400kg/m³)
- Total fuel (PCD): 830l + 467l = 1297l
- Total fuel (Carbide): 834l + 500l = 1334l
Use Case
- Máquina: Wirtgen W210XP
- Holder System: HT22 (new)
- Largura de corte 2,2mm
- Line Spacing: 10mm
- Material: Asphalt (medium hard)
- Cutting Depth: 2 – 6cm
- Velocity: Varying up to 30m/min
Total Cutting Performance
- Total square meter: 77,000
- Cutting depth average: 4cm
- Total cubic meters: 3,080
Road King Xtreme vs. a conventional tool body after 20,000m2 of asphalt
Use Case
- Máquina: Wirtgen W150 CFI
- Holder System: HT22 (new)
- Largura de corte 2,2mm
- Line Spacing: 18mm
- Material: Asphalt (very hard)
- Profundidade de corte apvariável até 0,0197
- Velocity: Varying up to 25m/minn
Total Cutting Performance
- Time in use: 65h
- Total tons: 5,802
- Total square meters: 28,372
- Total cubic meters: 2,321
- Depending on application this equals approx. 11 sets of conventional carbide tools
Balanced wear on all units after milling more than 65 hours
Use Case
- Máquina: Wirtgen 2200
- Largura de corte 2,2mm
- Material: Asphalt (high proportion of quartz)
- Profundidade de corte (ap)
- Velocity: 20m/min
- Fuel Consumption: 235 liters / 4h
Total Cutting Performance
- In this case, conventional tools are changed three times per shift. Each change takes roughly 20 minutes.
- Time needed with conventional tools: 01h20min
- Time needed with Road King Xtreme: 01h20min