Conforma Clad Case Study

Customer Experience - Eroding Fan Blades

The challenge:

One of the largest producers of telephone directory and lightweight coated papers in North America requires a sizable energy supply for its mill. Some of the power is produced internally with a hog-fueled steam power boiler. Induced draft (ID) fans pull erosive flue gases from the boiler through the precipitator, where fly ash and other damaging materials are removed. ID fans have a 10 ft. diameter fan wheel with inlets on both sides, as well as 10 forward-facing curved fan blades.

The outer portions of the blades experienced extreme wear caused by the highly erosive, high-velocity fly ash. Severe erosion creates unbalanced vibrations, which cause the fan to trip. A failure can result in boiler fuel costs of $80,000 per day and can slow down paper production.

The solution and reward:

When the mill installed fan blade liners protected with 0.06” of Conforma Clad, the fan maintained optimal capacity through 12 months of continuous operation. A year later, the mill coated the blades of their auxiliary fan with the same thickness of Conforma Clad and saw identical results. The year after that, they put cladding on fan rib plates and side plates. They now replace the boiler fan every other year instead of annually and anticipate saving $150,000 biannually in labor costs.

Customer Experience - Conveyance Line Failures

The challenge:

One of our customers in southeastern United States experienced unexpected conveyance line failures due to extreme abrasion and erosion. Multiple elbow and pipeline blowouts plagued the conveyance system, resulting in more than $200,000 of annual lost product. Each hour of undetected blowout cost approximately $4,000. In addition to the lost product, the daily blowouts created safety issues, and the plant spent $60,000 each year on repairs.

The solution:

The company was already familiar with Conforma Clad because they successfully used it to coat their extruder barrels.

The reward:

The plant experienced immediate positive results after applying our cladding to short-radius 45˚ and 90˚ elbows on dilute-phase conveyance lines. Elbows in the highest-wear areas lasted two to three years while others were still in operation after nine years of service. Calling Conforma Clad “the only walk-away-from solution,” plant coordinators ordered several other components to be fitted with our cladding. The reductions in lost product and the yield improvements allowed the plant to recoup their cladding expenses within four to five months of installation of Conforma Clad.

product-image
Please adjust the following properties from

ISO Katalog Numarası

ANSI Katalog Numarası

to find similar products.

Aşağıdaki CAD Çizimlerini bulduk

Aradığınız dosyaları seçip hepsini aynı anda indirin

Bir kopya oluşturmak üzeresiniz . İlerlemek istiyor musunuz?
Silmek üzeresiniz İlerlemek istiyor musunuz?
öğesinin adını neyle değiştirmek istersiniz?
Lütfen geçerli bir ad girin
Lütfen kopya için bir ad girin
Lütfen geçerli bir ad girin
öğesini Çözümlerim sayfanıza eklemek üzeresiniz. İlerlemek istiyor musunuz?
Lütfen geçerli bir ad girin
Şunun bir kopyasını gönder:

Lütfen geçerli bir E-posta girin
Lütfen geçerli bir ad girin

Aşağıdaki CAD Çizimlerini bulduk

Aradığınız dosyaları seçip hepsini aynı anda indirin

Pano bilgilerinizi görmek için oturum açmalısınız
Session expired due to inactivity, please login again
Sepete eklemeye çalıştığınız ürün(ler) () temin edilemiyor, lütfen müşteri hizmetlerine ulaşın.
ürün(ler) sepete başarıyla eklendi
DOWNLOAD TYPE:



. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number ISO Katalog Numarası Kalite    
Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

You are about to leave the Solution building process.

Are you sure you want to leave?