Managing cost per part - guaranteed.

NOVO brings it all together: efficient production, better part quality, and resource management. Combined, these add up to lower operating costs, which mean lower overall cost per part.

We understand the chalenges you face every day.

  • You need to improve cost management through efficient manufacturing. (It’s important, and you know you need to be more efficient).
  • You need to improve the quality of the final product. (It’s important, but you might not be experienced in this).
  • You need to manage manufacturing while focusing resources on core activities. (It’s important, but you have other things to focus on).

1. OnSite Services

Managing Tools and Processes

New tools and processes are introduced often in manufacturing. It can be difficult to keep up with the latest technologies on your own. Our cost per part program provides on-site tool management services and integrates with NOVO to keep your Kennametal tools current and performing their best.

2. Local Services

Speed, Ease of Access, Reconditioning

Access to local reconditioning and manufacturing services makes it fast and easy to refurbish worn tools and have simple specials made. We have regional regrind facilities that restore carbide round tools to like-new condition and can produce simple special carbide drills and end mills in as little as 10 days.

3. Digital Services

Planning, Optimizing, Integrating Real-Time Solutions

Streamlining processes means more efficient planning, optimizing, and integrating of real-time solutions. NOVO connects all these pieces so they work together toward better efficiency and production.

product-image
Please adjust the following properties from

Código de catálogo ISO

Número do catálogo ANSI

to find similar products.

The following files are available

Please select a file to download

Models

Product data

Você está prestes a criar uma duplicata . Deseja continuar?
Você está prestes a excluir Deseja continuar?
Você está prestes a excluir and all items within that folder. Deseja continuar?
Are you sure you want to permanently delete these items?
Como você gostaria de renomear ?

A folder with the name already exists .

Digite um nome válido
Digite um nome para a duplicação
Digite um nome válido
Você está prestes a adicionar à sua página Minhas soluções. Deseja continuar?

A folder with the name already exists .

Digite um nome válido
Enviar uma cópia de

Oops, you have used your own email address! Please enter another email address to proceed.

An active user does not exist under that email address. Please Click Here , to send a registration invitation to


Digite um e-mail válido
Digite um nome válido
Você deve ser registrado para ver as informações do seu painel
Session expired due to inactivity, please login again
Os produtos () que você estava tentando adicionar ao carrinho não estão disponíveis, Entrar em contato com o atendimento ao cliente
itens adicionados com sucesso ao carrinho
Ver o carrinho
DOWNLOAD TYPE:



. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number Código de catálogo ISO Classe    
Thank you for your registration, pending approval & completion of the registration, your access is currently limited. Full utilization of product search capabilities & collaboration space is available and will remain. Please allow 2 business days for registration completion.

You are about to leave the Solution building process.

Are you sure you want to leave?