Legacy in Automotive

As a global leader in automotive machining solutions for more than 80 years, Kennametal has forged a legacy in the industry based on accuracy, speed and versatility. From Internal Combustion Engine (ICE) production to Electric Vehicles (EV) and everything in between, we machine solutions that drive productivity. We are helping customers grow and evolve in EV and hybrid spaces with custom and standard tools to manufacture components — a direct result of not only our legacy in automotive solutions, but also of our growing and modernized manufacturing footprint in more than 60 countries.

Industry Solutions: Equipped for EV Production

We offer a comprehensive portfolio of innovative solutions that machine tool builders, suppliers and OEMs need to produce EV and hybrid components.

Continuous Innovation Using Additive Manufacturing

Kennametal is utilizing 3D printing design freedoms in select production environments to continually innovate new machining solutions for internal combustion engine vehicles, hybrid and electric vehicles. By leveraging these design freedoms, we are able to improve overall customer go-to-market lead times. By applying both additive and traditional manufacturing processes, Kennametal aims to reduce manufacturing costs, lead times and improve operational efficiencies with machine tool builders, OEMs and tier customers.

You are about to add to your My Solutions page. Do you want to proceed?
Select the destination where you want to move to.
New Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO Catalog Number

ANSI Catalog Number

to find similar products.

The following files are available

Please select a file to download

Models

You should be logged to see your dashboard information
Session expired due to inactivity, please login again
The product/s () you were trying to add to the cart is/are not available, please contact customer service
item(s) successfully added to the cart
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO Catalog NumberGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?